Friday, September 18, 2009

Outdoor living








This Summer John has been working on building a treehouse for the kids. He is finally done!!(almost) It is a 2 story treehouse that is 6 ft wide by 10 ft deep and it is 16 ft at the highest piont.
He designed and completed the entire thing from start to finish.
It turned out great.
It even has some great yellow shag carpet for comfort.
It has screened in walls on the top part for air ventilation, and it will eventually have a window cut into the front panel. There is a rock climbing wall on the right side, and a built in ladder on the left.
I think he did a great job!!
Next project. Basement repair (damage estimates from the insurance agent: $15000)

No comments: